Please, consult the new GMT page!
Hardware / Firmware / Online Software:
![]() |
Planning: Hardware Schedule (Milestones) Hardware: Schematics, Layout Firmware: VHDL Build System & CVS Structure, GMT VHDL Reference Manual (VHDLDOC) Online Software: Overview, Reference Manual, CVS Browser, JTAG Access Library, Hardware Access Library Configuration: VME Configuration Registers and LUTs Readout to DAQ: GMT Readout Record (general L1 Trigger Readout Page) Interface Documents: CMS IN 2004/022: Specification of the Interface Between the Regional Muon Triggers and the Global Muon Trigger CMS IN 2004/006: Specification of the Interface between the Global Muon Trigger and the Global Trigger CMS IN 2002/069: CMS Level-1 Global Calorimeter Trigger to Global Trigger and Global Muon Trigger Interfaces |
ORCA Simulation Results:
GMT simulation results with various ORCA versions
Presentations:
| Date | Occasion | Presented by | Title |
| 02 Feb 2005 | Workshop on Commissioning CMS Electronics, CERN | Manfred Jeitler | Global Trigger and Global Muon Trigger Installation Plans for Prevessin 904 setup |
| 09 Nov 2004 | Trigger Online Software Meeting, TriDAS Week, CERN | Hannes Sakulin | Global Muon Trigger Online Software Status & Plans (JAL details) |
| 09 Nov 2004 | Trigger Meeting, TriDAS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (GMT Board arrived) |
| 20 Sep 2004 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (GMT Layout, Readout, JAL) |
| 8 Jun 2004 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (Layout in progress, Cables, JAL) |
| 19 Apr 2004 | Review of the DTTF, GMT and GT, HEPHY Vienna, Austria | Hannes Sakulin | CMS Global Muon Trigger Review |
| 16 Mar 2004 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (new LUT handling) |
| 25 Feb 2004 | Calibration Database Workshop, CERN | Hannes Sakulin | Configuration Database Issues: DT Track Finder, Global Muon Trigger, Global Trigger |
| 9 Dec 2003 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (Choice of FPGAs, Latency, ORCA: New GMT Cands) |
| 4 Nov 2003 | Trigger Meeting, CPT Week, CERN | Hannes Sakulin | Global Muon Trigger and Global Trigger (includes TOTEM slides) |
| 1 Oct 2003 | 9th Workshop on Electronics for LHC Experiments, Amsterdam | Hannes Sakulin | The Level-1 Global Muon Trigger for the Compact Muon Solenoid Experiment |
| 17 Sep 2003 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (VHDL workflow, LUT Handling) |
| 08 Jul 2003 | RPC Electronics System Review, Warsaw | Claudia Wulz | Global Muon Trigger / RPC Interface(.ppt) |
| 03 Jun 2003 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (VHDL CVS, HW test file) |
| 05 May 2003 | Trigger Meeting, CPT Week, CERN | Claudia Wulz | Global Muon Trigger Update (new COUs, LUT handling, Chip Design) |
| 25 Feb 2003 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (new COUs detail, simu: merge by merge rank / combi) |
| 24 Sep 2002 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update (simu: di-muon trigger rates, combined rates, topological trigger) |
| 11 Jun 2002 | PRS Muon Meeting, CMS Week, CERN | Hannes Sakulin | L1 single and di-muon trigger rates at high luminosity (L=10^34) |
| 04 Dec 2001 | PRS Muon Meeting, CMS Week, CERN | Hannes Sakulin | L1 single and di-muon trigger rates at low luminosity (L=2x10^33) |
| 04 Dec 2001 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update |
| 06 Nov 2001 | Trigger Meeting, CPT Week, CERN | Hannes Sakulin | Global Muon Trigger Update |
| 29 Sep 2001 | Trigger/Software Meeting, CERN | C.-E. Wulz | On-line Software Requirements for the Global Trigger, Global Muon Trigger and Barrel Muon Trigger Track Finder |
| 25 Sep 2001 | Trigger Meeting, CMS Week, CERN | A. Taurok | Status of the Global Trigger and Global Muon Trigger |
| 24 Sep 2001 | Annual Review of the CMS Trigger, CERN | C.-E. Wulz | Global Trigger / Global Muon Trigger (+extra slides) |
| 11 Sep 2001 | Muon PRS meeting, CERN | Hannes Sakulin | L1 single and di-muon trigger rates at L=2x10^33 (preliminary results) |
| 28 Aug 2001 | Muon PRS meeting, CERN | Hannes Sakulin | A first look at the L1 single muon trigger rates at L=2x10^33 w. ORCA 5.1.2 |
| 19 Jun 2001 | Muon PRS meeting, CMS Week, Catania, Italy | Hannes Sakulin | Global Muon Trigger - Simulation Status |
| 24 Apr 2001 | Trigger Meeting, C. P. T. Week, CERN | Hannes Sakulin | Global Muon Trigger - status & plans |
| 7 Mar 2001 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger - status & plans |
| 23 Nov 2000 | Vorstandssitzung, HEPHY Vienna | Hannes Sakulin | CMS Global Muon Trigger (German) |
| 06 Nov 2000 | Trigger Meeting, TRIDAS Week, CERN | Hannes Sakulin | Global Muon Trigger Simulation (+ extra slides shown in discussion) |
| 06 Nov 2000 | Trigger Meeting, TRIDAS Week, CERN | Hannes Sakulin | Global Muon Trigger Conceptual Design |
| 27 Sep 2000 | Trigger Meeting, CMS Week, CERN | Hannes Sakulin | Global Muon Trigger Update |
| 06 Mar 2000 | LHCC Review, CERN | Hannes Sakulin | Global Muon Trigger Update |
| 09 Nov 1999 | Trigger Review, CERN | Hannes Sakulin | Global Muon Trigger |
| 08 Nov 1999 | Trigger Meeting, TRIDAS Week, CERN | Hannes Sakulin | Global Muon Trigger - Hardware Status and Simulation of Endcap |
| 05 Nov 1997 | Trigger Review, CERN | Norbert Neumeister | Global Muon Trigger - Status |
| 05 Nov 1997 | Trigger Review, CERN | A. Taurok | Global Muon Trigger - Hardware |
| 16 Sep 1997 | CMS week, Madison | Norbert Neumeister | The CMS Global Muon Trigger |
Theses:
Design and Simulation of the First Level Global Muon Trigger for the CMS Experiment at CERN
( .pdf 2.8 MB)
(hint: download and view locally in case some plots do not show up)
Hannes Sakulin
November 2002
CMS Notes:
The Level-1 Global Muon Trigger for the CMS Experiment
Hannes Sakulin, Anton Taurok
Presented at: 9th LECC 2003 Workshop, Amsterdam, Holland, September 29 to October 3, 2003.
CMS Conference Record 2003/040
A Robust Solution to the Ghosting Problems of the CMS Level-1 Muon Trigger in the Barrel/Endcap Overlap Region
( .pdf)
Hannes Sakulin
CMS Internal Note 2002/024
Studies of the Global Muon Trigger Performance
(.ps,
.pdf,
.tar.Z)
Hannes Sakulin, Massimiliano Fierro
CMS Note 2001/003
Simulation
of the Global Muon Trigger (ps
file)
Norbert Neumeister, Paul Porth, Herbert Rohringer
CMS Internal Note 1997/023
Muon Tracks:
Collection of simulated muon tracks with CMS 121 geometry